Our Projects






Completed Projects12
Services | Name of Work | Client |
---|---|---|
Railway |
Satellite Survey work for feasibility to fix feasible corridor of Railway Line from Agartala (India) to Akhaura (Bangladesh) (16km). |
IRCON International Ltd. |
Detailed Survey, Engineering and Design work for the up-gradation of existing BG Railway Track between Galle to Matara for Coastal Railway in Sri Lanka (42Km). |
||
Carrying out Survey work between Galle- Matara Section. |
||
Preliminary Survey for the Gauge conversion NG to BG from Gluer to Jogindernagar using modern technique of Remote Sensing and Digital Terrain Model including ground fixing of alignment using GPS (Global Positioning System) (95Km). |
Northern Railway | |
Preliminary Survey of new BG line from Jogindernagar to Bilaspur using modern technique of Remote Sensing and Digital Terrain Model including ground fixing of alignment using GPS (Global Positioning System) (95Km). |
||
Detailed Engineering Survey for new B. G. Line between Kathua-Basoli-Bhadarwah-Kishtwar (275 KM). |
||
Road |
Detail Survey, Planning, Design & Estimation of proposed approach road to Lower Dam at Malshej Ghat Project |
Tehri Hydro Development Corporation |
Carrying out Feasibility Analysis and preparation of Bill of Quantities of Alignment for construction of Rih-Tiddim Road in Myanmar |
IRCON International Ltd. |
|
Feasibility Analysis, Fixing of Corridor Alignment of Road from Kaletwa to Paletwa in Myanmar |
||
Other |
Preparation of Topographical map using Satellite stereo data at Dasve for 1700 Acre as per detail scope of work |
Lavasa |
Ongoing Projects
Services | Name of Work | Client |
---|---|---|
Railway |
Preliminary survey for a New BG Railway Line between ERUMELI-PATHANAMTHITTA.(136Km.) |
Southern Railway |
Preliminary Engineering-Cum-Traffic Survey for new Railway B.G. Line Between Padidipalli-Shankerpalli Station.(110Km.) |
Southern Central Railway |
|
Conducting Preliminary Engineering-Cum-Traffic Survey for New Railway BG Line from Bhadrachalam road to Visakhapatanam station (joining at Annavaram) (240 km). |
||
Preliminary Engineering-cum-Traffic Survey For New BG 4th Line Track From Ernakulam To Shoranur(106.85 Km). |
Southern Railway | |
Carrying out Preliminary Engineering Survey For 4th Line between Jharsuguda-Durg(374 KM.) Including two fly over in Champa-Jharsuguda Section. |
South East Central Railway |
|
Checking all the drawings for completeness as provided by the client. |
Infotel Broadband Services Ltd |